Asset Report
Sanjiv Ridge iron ore mine
Report summary
The first ore was crushed at Sanjiv Ridge in February 2021, with a target production of 5 Mtpa expectedly achieved in 2022. Sanjiv Ridge will produce 4-5 Mtpa over 5 to 6 years of a 58% Fe fines and lump product. With an estimated capital expenditure of A$50 million, this translates to a capital intensity of US$12.50, at 4 Mtpa. Production from Sanjiv Ridge will support Atlas Iron's portfolio as Mt Webber ramps down ahead of depletion in 2024.
Table of contents
- Summary
- Key issues
-
Emissions
- Production
Tables and charts
This report includes 13 images and tables including:
- Sanjiv Ridge Emission Intensity Quartile ranking – total global production - tonnes of ore
- Marketable reserves (01/01/2024)
- Production
- Operations
- Infrastructure
- Cash costs
- Cash Costs
- Capital Costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hawsons iron ore mine
Hawsons is a proposed iron ore mine that will produce 11Mtpa of high-grade DR pellet feed.
$2,250
Asset Report
Utah Point Hub iron ore mine
Output from Wonmunna has ramped up quickly, allowing Iron Valley to be scaled back from blend. Lamb creek is next to be developed.
$2,250
Asset Report
Mt Webber iron ore mine
Mt Webber is owned by Hancock Prospecting following its takeover of Atlas. Production is now ramping down ahead of depletion in 2024.
$2,250